A beautiful floor laid on a bad one is a beautiful floor for a year.

What goes underneath decides how long what goes on top survives. It is the least interesting part of the job and the only part that determines the outcome.

Herringbone part-laid, set out from the centre line so the cuts finish under the skirting.
Herringbone part-laid, set out from the centre line so the cuts finish under the skirting.
A plywood subfloor cut in and screwed down flat before any finish goes near it.
A plywood subfloor cut in and screwed down flat before any finish goes near it.
Boards up and joists open — the only cheap moment to check pipework and insulate.
Boards up and joists open — the only cheap moment to check pipework and insulate.

How the job runs

  1. Find out what is under there — boards, joists, concrete, or something previously patched. It sets everything.
  2. Lift where lifting is needed — soft timber replaced, pipe runs checked and clipped so nothing ticks under a new floor.
  3. Insulate while it is open — a few hours now, or a floor lifted again later.
  4. Lay and screw the subfloor — plywood, cut in, screwed at close centres. Screwed, never nailed.
  5. Set out from the centre — especially herringbone, so the walls' errors go under the skirting.
  6. Lay, then finish and trim — thresholds, beading and skirting last, so the floor can move as it should.

What goes wrong when it is done badly

Almost every failed floor I am called to is a subfloor problem wearing a different coat. Boards gap at the joints, laminate clicks apart along a walking line, tiles crack in a straight run across a room, parquet lifts at a corner. In every case the owner assumes the material was poor, and in almost every case the material was fine and the thing underneath it was moving. The other one is fitting a floor tight to the walls with no expansion gap. Timber moves with the seasons whether or not you allow for it, and a floor with nowhere to go will lift in the middle of a room, usually in the first warm damp spell after it is laid.

Questions I get asked

Do you lay herringbone?

Yes. It is set out from the centre line of the room rather than from a wall, because the walls in these houses are not square, and setting out from one carries its error across the whole floor.

Why do you put plywood down first?

Because the subfloor decides how long the finish lasts. If it is flat and solid almost anything will last. If it flexes, boards gap, laminate clicks apart and tile cracks in a line — and none of it can be repaired from above.

My floor creaks. Can that be fixed?

Usually. A floor that creaks was generally nailed rather than screwed, or has boards that have worked loose over pipe runs. Both are fixable while the floor is up.

Can you insulate while the floor is open?

Yes, and that is the only cheap moment to do it. It is a few hours then, or a floor lifted again later.

If a floor is moving, creaking, or you are thinking about herringbone and want it set out properly, I will come and look at what is under the one you have. Call Andrew on the number at the top of this page.

Call Andrew on +44 7984 620077
The rest of what I doBathroomsKitchensPlumbingPlasteringTilingDamp & mouldDecoratingJoinery